Winter Slips and Storage
Winter Storage Slips: | October 15th to May 15th $17 per foot based on length of slip $150 Winter Associate Membership Fee Electricity individually metered at every slip |
Winter Upland Storage Rates: |
October 15th through May 15th. |
Shrink Wrapping: |
$19.00 per foot on land. $22.00 per foot in water. (Key Members)Door |
Labor Rates: |
$55.00 per hour |
* Bottom Power Wash: |
$55 up to one hour. |
Updated 02/19/2021